frequently asked questions

planning permission

planning permission may be required depending on your local authority, the size of your studio, the size of your garden and whether you are in a conservation area.

 

the building process

studios are built on site from scratch and take approximately 4 weeks to complete. disruption is minimal as all the work takes place in the garden.

 

guarantee

all work is guaranteed for 10 years.

 

heat and electrics

electricity is supplied from the main fuse box. all studios are fully insulated and heated with electric oil filled radiators.

 

see here for a useful

photography by dirk lindner

london garden studios

© 2017 Copyright London garden Studios - All Rights Reserved.

Site re-configured by SPOONFEDESIGN